Cost Analysis Due to the Addition of Working Time on Periodic Road Maintenance Project on Jl. Ir. Soekarno Ruas 3 Blitar City

Authors

  • Eka Shodiq Permadi University of 17 August 1945 Surabaya
  • Hanie Teki Tjendani University of 17 August 1945 Surabaya
  • Budi Witjaksana University of 17 August 1945 Surabaya

DOI:

https://doi.org/10.61132/ijiime.v2i1.161

Keywords:

Additional costs, Project delay, Road damage, Road maintenance, Time Cost Trade Off (TCTO)

Abstract

Prolonged road damage disrupts community mobility, logistics activities, and reduces road user safety. The road maintenance project on Jl. Ir. Soekarno in Blitar City, which was planned to be completed in 120 days with a budget of Rp1.16 billion, experienced a delay of 8 days due to time management constraints. This study aims to evaluate the use of the Time Cost Trade Off (TCTO) method to accelerate project completion without reducing the quality of work. The TCTO method is used to analyze the relationship between time and cost. This research proposes additional overtime working hours of 2 hours per day with the assumption of resources according to the Cost Budget Plan (RAB). The results show that with this method, the project can be completed in 117 days at a total cost of Rp1,342,177,724. Although it requires additional costs, this acceleration allows the project to be completed faster than the previous condition

References

Adhitya Putra, D., Lhara Sari, O., & Situmorang, R. (2023). Analisis Faktor Keterlambatan Proyek Konstruksi Di Kota Balikpapan. Jurnal Teknik Sipil : Rancang Bangun, 9(1), 017–024. https://doi.org/10.33506/rb.v9i1.2044

Anggraeni, E., Hartono, W., & Sugiyarto. (2017). Analisis Percepatan Proyek Menggunakan Metode Crashing Dengan Penambahan Tenaga Kerja dan Shift Kerja (Studi Kasus : Proyek Pembangunan Hotel Grand Keisha, Yogyakarta). e-Jurnal MATRIKS TEKNIK SIPIL, 5(2), 605–614.

Dimyati, H., & Nurjaman, K. (2014). Manajemen Proyek. PUSTAKA SETIA.

Ervianto, W. I. (2004). Teori – Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi.

Fazri, M., Widiastuti, M., & Jamal, M. (2020). Analisis Percepatan Waktu Dengan Menggunakan Metode Time Cost Trade Off Pada Proyek Pembangunan Rusun 1 Kota Samarinda Kalimantan Timur. Teknologi Sipil, 3(2), 1–14.

Mulyo, S. A., Said, L. B., & H, S. M. (2023). Analisis Pemeliharaan Jalan Nasional dengan Metode Bina Marga dan PCI Pada Ruas Jalan Slamet Riyadi Kota Samarinda. Jurnal Flyover, 3(1), 51–59. https://doi.org/10.52103/jfo.v3i1.1508

Nuryanti, P., & Sari, N. (2021). ( Kumai Seberang Kabupaten Kotawaringin Barat Provinsi Kalimantan Tengah ) MAINTENANCE OF ROADS AND SUPPLEMENTARY ROADS IN THE TRANSMIGRATION AREA. 12(1), 56–67.

Downloads

Published

2025-01-27

How to Cite

Eka Shodiq Permadi, Hanie Teki Tjendani, & Budi Witjaksana. (2025). Cost Analysis Due to the Addition of Working Time on Periodic Road Maintenance Project on Jl. Ir. Soekarno Ruas 3 Blitar City. International Journal of Industrial Innovation and Mechanical Engineering, 2(1), 127–139. https://doi.org/10.61132/ijiime.v2i1.161