[1]
Eka Shodiq Permadi et al. 2025. Cost Analysis Due to the Addition of Working Time on Periodic Road Maintenance Project on Jl. Ir. Soekarno Ruas 3 Blitar City. International Journal of Industrial Innovation and Mechanical Engineering. 2, 1 (Jan. 2025), 127–139. DOI:https://doi.org/10.61132/ijiime.v2i1.161.