[1]
Alfonsus Fung Abimanyu Wicaksono and I Nyoman Dita Pahang Putra 2024. Comparison Of The S Curve With The CPM Method In Analyzing Project Scheduling. International Journal of Industrial Innovation and Mechanical Engineering. 1, 3 (Aug. 2024), 46–57. DOI:https://doi.org/10.61132/ijiime.v1i2.18.