Analysis of Domestic Component Level (TKDN) and Company Benefit Weight (BMP) in Construction Projects

Authors

  • Dwi Lutfil Khakim Universitas Pembangunan Nasional "Veteran" Jawa Timur
  • I Nyoman Dita Pahang Putra Universitas Pembangunan Nasional “Veteran” Jawa Timur

DOI:

https://doi.org/10.61132/ijmecie.v1i3.19

Keywords:

Domestic Component Level, Company Benefit Weight, Construction Projects

Abstract

In the world of construction projects, good project management is required, including the use of domestic products. The government encourages the use of domestic products through the program to increase the use of domestic production (P3DN). The amount of domestic content in commodities, services, and the combination of products and services can be used to measure the use of domestic products. This quantity is called the Domestic Component Level (TKDN). Company Benefit Weight (BMP) is an award given to industrial companies that invest and produce in Indonesia. This research aims to calculate the amount of TKDN and BMP for the Muhammadiyah Ahmad Dahlan Kediri Hospital construction project. With reference to the Ministry of Industry of the Republic of Indonesia's Regulation No. 16 of 2011 regarding Provisions and Procedures for Calculating Domestic Component Levels, the research employs a descriptive quantitative methodology to compute and analyze Domestic Content Levels (TKDN). The results of analytical calculations show that the TKDN percentage is 69.65% and the BMP percentage is 3%. This research concluded that the total TKDN and BMP was 72.65%, thus meeting the minimum limit for the sum of TKDN and BMP of 40%.

References

Dharmayanti, I., Afriansyah, H., Rachmawati, D., Rokayah, H., & Febriani, Y. (2022). Peningkatan Penggunaan Produk Dalam Negeri (P3DN) Dalam Pengadaan Barang/Jasa Pemerintah. Pusat Pendidikan dan Pelatihan Pengadaan Barang/Jasa Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah. Retrieved from https://diskes.badungkab.go.id/storage/diskes/file/Buku-Saku-P3DN.pdf

Diah, S. (2021). Kajian harga bahan pada proyek konstruksi dengan analisa dinamik. Jurnal Teknik Sipil, Institut Teknologi Bandung, 28(1), 117-124. https://doi.org/10.5614/jts.2021.28.1.12

Ervianto, W. I. (2023). Manajemen Proyek Konstruksi. Penerbit ANDI. Retrieved from https://books.google.co.id/books?hl=id&lr=&id=jHLDEAAAQBAJ&oi=fnd&pg=PP1&dq=Manajemen+proyek+konstruksi&ots=RbgpUIsNQo&sig=-mJ_VxbBbclJw1GzhlLLjuYZKV8&redir_esc=y#v=onepage&q&f=false

Faisal, N. I., Morasa, J., & Mawikere, L. M. (2017). Analisis sistem pengadaan barang dan jasa (Penunjang Langsung) pada Dinas Pekerjaan Umum dan Penataan Ruang Kota Manado. Going Concern: Jurnal Riset Akuntansi, 12(2). https://doi.org/10.34001/jdc.v4i2.1097

Kementerian Perindustrian Republik Indonesia. (2011). Peraturan Menteri Perindustrian Republik Indonesia No. 16 tentang Ketentuan dan Tata Cara Perhitungan Tingkat Komponen Dalam Negeri. Retrieved from https://tkdn.kemenperin.go.id/download.php?id=lt8tG9OEoFWHMGfKNpS5pkapHCd-dI30iFsyPD4VBwo

Kementerian Perindustrian Republik Indonesia. (2022). Panduan Penggunaan Produk Dalam Negeri. Retrieved from http://pusatp3dn.kemenperin.go.id/files/ebookdib/20220329090131_1.pdf

Novita, R. D., & Pangestuti, E. K. (2021). Analisa quantity take off dan rencana anggaran biaya dengan metode building information modeling (BIM) menggunakan software Autodesk Revit 2019 (Studi Kasus: Gedung LP3 Universitas Negeri Semarang). Dinamika Teknik Sipil: Majalah Ilmiah Teknik Sipil, 14(1), 27-31. https://doi.org/10.23917/dts.v14i1.15276

Nugraheni, S. R. W., Widyastutik, Amaliah, S., Panjaitan, I., Yulisyawati, I., & Malau, F. (2021). Strategi peningkatan daya saing sektor jasa konstruksi di Indonesia. Jurnal Ekonomi dan Kebijakan Pembangunan, 10(2), 176-200. https://doi.org/10.29244/jekp.10.2.2021.176-200

Pemerintah Republik Indonesia. (2018). Peraturan Pemerintah (PP) Nomor 29 Tahun 2018 tentang Pemberdayaan Industri. Retrieved from https://peraturan.bpk.go.id/Details/89213/pp-no-29-tahun-2018

Putra, I. N. D. P., Amalia, Y. S., & Dewi, G. A. M. K. (2019). Framework of construction procedure manual of the project management unit and other stakeholders in the Surabaya City Government. International Journal of Advanced Research in Engineering and Technology, 10(6), 174-182. https://doi.org/10.34218/IJARET.10.6.2019.021

Putrianti, P. R. (2021). Evaluasi jumlah tenaga kerja dalam konstruksi menghadapi era new normal. Jurnal Riset Rekayasa Sipil, 4(2), 75-82. https://doi.org/10.20961/jrrs.v4i2.44298

Riwibowo, N., Wijaya, O. D., Rohman, M., & Afan, M. M. (2023). Kajian analisis harga satuan pekerjaan (AHSP) SNI 2016 dibandingkan dengan Bina Marga 2020 pada pekerjaan lapis aspal AC-BC dan AC-WC. Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil, 28(1), 90-107. Retrieved from https://jurnal.polines.ac.id/index.php/wahana/article/view/4564

Situmeang, I. S. (2017). Pembatalan surat penunjukan penyedia barang dan jasa (SPPBJ) dalam kontrak pengadaan barang dan jasa pemerintah. DiH: Jurnal Ilmu Hukum, 13(26), 217-230. https://doi.org/10.30996/dih.v0i0.1584

Tanubrata, M. (2015). Bahan-bahan konstruksi dalam konteks teknik sipil. Jurnal Teknik Sipil, 11(2), 132-154. https://doi.org/10.28932/jts.v11i2.1407

Utama, W., & Syairudin, B. (2020). Perencanaan dan pengendalian proyek konstruksi dengan metode Critical Chain Project Management dan Root Cause Analysis. Jurnal Teknik ITS, 9(2), 157-163. https://doi.org/10.12962/j23373539.v9i2.54339

Zikriadi, Sulaiman, U., & Hifza. (2023). Aneka jenis penelitian. SAMBARA: Jurnal Pengabdian Kepada Masyarakat, 1(1), 36-46. https://doi.org/10.58540/sambarapkm.v1i1.157

Published

2024-05-29

How to Cite

Dwi Lutfil Khakim, & I Nyoman Dita Pahang Putra. (2024). Analysis of Domestic Component Level (TKDN) and Company Benefit Weight (BMP) in Construction Projects. International Journal of Mechanical, Electrical and Civil Engineering, 1(3), 23–37. https://doi.org/10.61132/ijmecie.v1i3.19