Design and Construction of Scaffolding with a Lifting Capacity of 300 kg Using a Drive Electric Hoist AC 220 V

Authors

  • Riles Melvy Wattimena Politeknik Negeri Semarang
  • Ignatius Gunawan Widodo Politeknik Negeri Semarang
  • Yuris Bahadur Wirawan Politeknik Negeri Semarang
  • Ahmad Mamba'udin Politeknik Negeri Semarang
  • Abdul Syukur Alfauzi Politeknik Negeri Semarang
  • Bambang Tjahjono Politeknik Negeri Semarang
  • Timotius Anggit Kristiawan Politeknik Negeri Semarang
  • Trio Setiyawan Politeknik Negeri Semarang

DOI:

https://doi.org/10.61132/ijmecie.v2i4.357

Keywords:

AC Electric Hoist, Electric Scaffolding, Lifting Equipment, Machine Design, Transporting Equipment

Abstract

Maintenance and repair work in a building or structure is not only in low places, but also in high places which require assistive devices. The assistive device in question is scaffolding. The design of this scaffolding begins with a literature study followed by data collection in the Mechanical Engineering Department of the Semarang State Polytechnic to obtain data on the need for height assistive devices which are used as a reference for making electric scaffolding. The purpose of this study is to design an electric scaffolding with a capacity of 300 kg and to perform the performance of the electric scaffolding made. After the design of the electric scaffolding, the dimensions of the equipment were obtained, namely 1000 mm x 1500 mm x 2000 mm and specifications that can lift goods with a maximum height of 5 m, a minimum height of 0.35 m, a maximum load of 300 kg and an AC 220 V electric hoist drive. Based on the results of the performance test, in this case the test data was taken from the weight of the load that the machine can lift based on the travel time when the machine moves up and down. The load weight of 300 kg with electric scaffolding was covered in 27.44 seconds when going up and 21.02 seconds when moving down.

References

Andu, F. A. (2019). Kajian perancah ditinjau dari keselamatan dan kesehatan kerja. Jurnal Ilmiah Media Engineering, 9(1), 21–26.

Budynas, R. G., & Nisbett, J. K. (2015). Shigley’s mechanical engineering design (V. Bradshaw, Ed.; 10th ed.). McGraw-Hill Education.

Cross, N. (2021). Engineering design methods: Strategies for product design (5th ed.). John Wiley & Sons.

Destyarini, A., & Hartono, W. (2016). Analisis perbandingan penggunaan perancah baja konvensional dan perancah baja modifikasi. E-Jurnal Matriks Teknik Sipil, 4(3), 714–722.

Dzeng, R. J., Cheng, C. W., & Cheng, C. Y. (2024). A scaffolding assembly deficiency detection system with deep learning and augmented reality. Buildings, 14(2). https://doi.org/10.3390/buildings14020385

Fang, W., Ding, L., Zhong, B., Love, P. E. D., & Luo, H. (2018). Automated detection of workers and heavy equipment on construction sites: A convolutional neural network approach. Advanced Engineering Informatics, 37, 139–149. https://doi.org/10.1016/j.aei.2018.05.003

Frick, H., & Suskiyanto, P. L. (2002). Ilmu konstruksi perlengkapan dan utilitas bangunan (5th ed.). Kanisius.

Hsiao, H. (2020). Evaluating technology and research knowledge gaps for prevention of falls from scaffolds. Journal of Safety Research, 72, 91-101.

Indonesia, S. N. (2020). Beban desain minimum dan kriteria terkait untuk bangunan gedung dan struktur lain.

Li, S., Gu, X., Xu, X., Xu, D., Zhang, T., Liu, Z., & Dong, Q. (2021). Detection of concealed cracks from ground penetrating radar images based on deep learning algorithm. Construction and Building Materials, 273, 121949. https://doi.org/10.1016/j.conbuildmat.2020.121949

Lubis, S. A. (2024). Safety analysis of using scaffolding in multi-storey building construction. Qistina: Jurnal Ilmiah Teknik Sipil, 8(2), 45-57.

Prameswara, C. D., & Sutandi, A. (2024). Pengaruh tangga scaffolding proyek terhadap waktu pengerjaan plester dan acian. JMTS: Jurnal Mitra Teknik Sipil, 7(1), 315–320. https://doi.org/10.24912/jmts.v7i1.26623

Sormin, S. A., & Simanjuntak, W. S. (2024). Analisis risiko K3 karyawan kontraktor renovasi di ketinggian di Kota Batam. Jurnal Comasie, 11(3), 87–97.

Suharyani, S., & Fathonah, M. N. (2019). Identifikasi material scaffolding sebagai alternatif tempat tinggal untuk kalangan masyarakat berpenghasilan rendah (MBR): Studi kasus di Akanoma Studio. Sinektika: Jurnal Arsitektur, 15(1), 23–33. https://doi.org/10.23917/sinektika.v15i1.8993

Yasin, N. (2019). Kekuatan dan kebutuhan perancah bingkai/frame scaffold pada konstruksi gedung. Jurnal Ilmiah Desain dan Konstruksi, 18(2), 212–218. https://doi.org/10.35760/dk.2019.v18i2.2574

Downloads

Published

2025-10-25

How to Cite

Riles Melvy Wattimena, Ignatius Gunawan Widodo, Yuris Bahadur Wirawan, Ahmad Mamba’udin, Abdul Syukur Alfauzi, Bambang Tjahjono, … Trio Setiyawan. (2025). Design and Construction of Scaffolding with a Lifting Capacity of 300 kg Using a Drive Electric Hoist AC 220 V. International Journal of Mechanical, Electrical and Civil Engineering, 2(4), 184–194. https://doi.org/10.61132/ijmecie.v2i4.357