[1]
Yonandika Pandu Putranto et al. 2025. Project Cost Analysis Using the Earned Value Method on the Bagor Bridge Replacement Project in Situbondo Regency. International Journal of Mechanical, Electrical and Civil Engineering. 2, 1 (Jan. 2025), 138–148. DOI:https://doi.org/10.61132/ijmecie.v2i1.139.