[1]
M. Hery Indra Setiawan et al. 2025. Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method. International Journal of Mechanical, Electrical and Civil Engineering. 2, 1 (Jan. 2025), 193–198. DOI:https://doi.org/10.61132/ijmecie.v1i1.149.