[1]
Ibnu El Musayyab et al. 2025. Time Management Analysis of the Construction of the Kali Tuan Dam Project in Indramayu Regency. International Journal of Mechanical, Electrical and Civil Engineering. 2, 1 (Jan. 2025), 237–244. DOI:https://doi.org/10.61132/ijmecie.v2i1.213.