M. Hery Indra Setiawan, Budi Witjaksana, & Jaka Purnama. (2025). Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method. International Journal of Mechanical, Electrical and Civil Engineering, 2(1), 193–198. https://doi.org/10.61132/ijmecie.v1i1.149