YONANDIKA PANDU PUTRANTO; ANDI PATRIADI; SAJIYO SAJIYO. Project Cost Analysis Using the Earned Value Method on the Bagor Bridge Replacement Project in Situbondo Regency. International Journal of Mechanical, Electrical and Civil Engineering, [S. l.], v. 2, n. 1, p. 138–148, 2025. DOI: 10.61132/ijmecie.v2i1.139. Disponível em: https://international.aritekin.or.id/index.php/IJMECIE/article/view/139. Acesso em: 26 may. 2025.