Ibnu El Musayyab, et al. “Time Management Analysis of the Construction of the Kali Tuan Dam Project in Indramayu Regency”. International Journal of Mechanical, Electrical and Civil Engineering, vol. 2, no. 1, Jan. 2025, pp. 237-44, doi:10.61132/ijmecie.v2i1.213.