M. Hery Indra Setiawan et al. 2025. Analysis of Project Delays Impact by Cost in The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method. International Journal of Mechanical, Industrial and Control Systems Engineering. 2, 1 (Jan. 2025), 01–08. DOI:https://doi.org/10.61132/ijmicse.v2i1.155.