M. Hery Indra Setiawan, Budi Witjaksana, & Jaka Purnama. (2025). Analysis of Project Delays Impact by Cost in The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method. International Journal of Mechanical, Industrial and Control Systems Engineering, 2(1), 01–08. https://doi.org/10.61132/ijmicse.v2i1.155