M. Hery Indra Setiawan, Budi Witjaksana and Jaka Purnama (2025) “Analysis of Project Delays Impact by Cost in The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method”, International Journal of Mechanical, Industrial and Control Systems Engineering, 2(1), pp. 01–08. doi: 10.61132/ijmicse.v2i1.155.